The package came off of a 250tph drum plant that produced approx.183k lifetime tons. Each silo is estimated to have had approx 75k lifetime tons ran through them. Silos erected, with a takedown date of 3-24-2025 . Used for a job.
### 2022 (2) 200Ton Astec Silos: Put in use in 2023
* (2) Twin 200 Ton NEW GENERATION SILOS
* 200 Ton 14' Diameter Silos Based on 120 Pound/Cubic Foot Material
* 1/2" Ceramic Liners 37" Above & Below Cone-Spool Joint
* Electric Blanket Heat on Cone
* 3 Ton Enclosed Batcher
* Full 1/2 Ceramic Batcher Liners
* PM Electrical in Silo Power Panel W/ Cables
### 2022 400TPH ASTEC DRAG:
* 36" x 43" Deep x 84' 9 5/8" Long Main Slat
* Single Chain 34" Slats
* 75HP Motor on Drive Package
* Ni-Hard Liners on Bottom And 8" High on Sides
* Dual Side Stairways
* Hot Oil Heated floor
* PM Electrical in Silo Power Panel
### 2022 ASTEC 36" TRAVERSE CONVEYOR:
* 30" Deep x 36" Wide By 15' Long
* Double Chain 34" Slats
* 25HP Motor on Drive Package Hot Oil Heated Floor
* Walk Way on One Side
* PM Electrical in Silo Power Panel
### 2022 ASTEC 11'x80' LOW PROFILE TRUCK SCALE:
* Fully Electronic
* Has Checkered Steel Deck (Ships in 4 Sections with 10 load Cells and 1 Summing Box)
* Passes The Bureau of Standards Handbook 44 criteria
* NTEP Certified
### 36" SILO CONSOLE
* Set Up for (2) Silos (1) Future