Make: Vulcan Drying Systems
Year: 2019
Drum: 40'
Gearbox: TXT8
Drum Motor: Missing
Combustion Chamber
Conveyor Assembly to Creep Feed Material Up to the Screw Conveyor (Screw Missing)
Gencor Burner
Blower
Electrical Cabinet
Condition and Missing Components Notes:
1. missing feed screw and modified combustion chamber with the screw absent they added some sort of gravity flap
2. missing fuel train and regulator
3. one set of legs to combustion chamber missing
4. missing 50 hp 1775 hp 3 ph electric motor, pulleys and belt to drive the drum
5. most of the electric wiring was cut in numerous places
6. missing air actuated flap gate on knock out box
7. Some of the ceramic blocks at the face of the combustion chamber are missing as well.
DOWN ON GROUND, READY FOR LOAD OUT